ARS Washing LTD
ARS Washing Ltd 1st August 2006, washing plant with state of the art servicing facilities and highly skilled washing experts, This ensures consistently quality which can provide customers satisfaction according to customers requirements. We used specialized machines to achieve various dry process effects and specialized detailed design.
Address : | Plot-719, Mouza-109, Squibb Road, Auch Para, Nishat Nagar, Tongi, Gazipur-1711. Phone:02-9816928,02-9816927 |
Contact Person : |
Md. Tozammel Hoque Md. Humayun Kabir |
OBJECTIVE
Our objective just not to meet the growing demand in industry but our aim is to provide a quality services to the garment industry that continuously goes beyond this. We focus on building a long term partnership with our customers providing them not only with the quality service but also working with them to develop their creativity in terms of developing design according to the customer requirements.
Negotiating Bank : | AB BANK LIMITED. Uttara Branch, Uttara,Dhaka. |
Floor Space : | 30,000Sft (Length-208 Ft, Width-144 Ft.) Floor covered with tiles, heat proof roofing. |
Gas Oven : | 3 Units |
Compressor : | 2 Units |
Hydro Extractor : | 3 Unit (Made in China) & 2 Unit (Made in Turkey), Total = 05 Units |
Steam Boiler : | 4 Ton – (Made in Germany), 1 (One) No. |
Generator : | DALE 600 KVA (Made in UK) & Max Energy 440 KVA (Made in U.S.A), Total = 2 (Two) Nos. |
Gas Capacity : | 12000 sft. |
Man Power : | 725 Person (2-Shift) |
Covered Van & Car : | 2000 kg-Three (03), 1500 Kg-Three (03), 1000 Kg-Four (04), Car Three (03), Total = 13 (Thirteen), Nos. |
WORK PLACE ENVIRONMENT
Clearly demarcated emergency routes & exit, smoke & fire detectors, well ventilation, consciously Designed lay out ensure a safe work place for worker. As per ISO Requirements, instruction and warning Signs are posted in highly Visible place inside the factory and in local language (Bangla).
SAFTY AND INTIGRITY
ARS strictly adheres to ethical business-practice. It carries out Compliance as a continuous process, and exceeds local legislations to meet ILO convention in term of employment practice and safety. Its compliance management team monitors and reviews the various Activities performed throughout the organization.
EFFLUENT TREATMENT PLANT
Our washing facilities is equipped with Effluent Treatment plant Facilities that can decontaminate the waste water before disposal.
OUR RANGE
Wet Processing | Dyeing | Dry Processing |
Acid wash Stone Wash Stone Bleach Wash Stone Enzyme Wash Pigment Wash Over Dye Tint Wash Enzyme Silicon Wash Normal wash Rubber Ball Wash Marble Wash Towel wash Garments Wash etc. |
Garment Dyeing(Reactive) Garment Dyeing (Pigment) Garment Dyeing(Direct) Garment Dyeing (Fluorescent) Crack Acid Wash Burnout Wash Dischargeable Dyeing Washable Dyeing Wave Dyeing Tie Dyeing Spray Dyeing Deep Dyeing Cool Dyeing etc. |
3D- Effect
|
Wet Process Machinery
Machine Type | Capacity | Quantity | Country of Origin | End Use |
Washing & Dyeing Machine | 550 Lbs | 21 Set | Made in China | Production |
Washing & Dyeing Machine | 800 Lbs | 03 Set | Made in China | Production |
Washing & Dyeing Machine | 150 Lbs | 02 Set | Made in China | Sample |
Washing & Dyeing Machine | 120 Lbs | 02 Set | Made in China | Sample |
Washing & Dyeing Machine | 100 Lbs | 01 Set | Made in China | Sample |
Washing & Dyeing Machine | 60 Lbs | 01 Set | Made in China | Sample |
Total | 30 set |
Dryer Machine
Dryer Type | Capacity | Quantity |
Gas Dryer | 300 lbs | 21 set |
Gas Dryer | 550 lbs | 3 set |
Steam Dryer | 300 lbs | 3 set |
Total | 27 set |
Production Capacity (wet process) :
Mid Stone Wash - 2,000pcs/day
Heavy Stone Wash - 10,000pcs/day
Stone Bleach Wash - 9,000pcs/day
Normal Wash - 20,000pcs/day
Enzyme Silicon Wash -15,000pcs/day
Dyeing- Approximately 15,000pcs/day (Depends on Shade and Dyeing type)
Dry Process Machinery
Name of Machine | Quantity |
Hand Brush Machine | 60Pcs |
P.P Spray Machine | 06Pcs |
Grinding Machine | 14Pcs |
Tagging Machine | 10Pcs |
Crinkle Machine | 06Pcs |
Press Machine | 10Pcs |
Dummy Machine | 07Pcs |
3D Machine | 12Pcs |
Hand Brush – 15,000pcs/day,
Whisker – 15,000pcs/day
Crinkle - 9000pcs/day
Tagging - 20,000pcs/day
P.P – 20,000pcs/day
3D – 7000pcs/day
Pressing - 8000pcs/day
Grinding –20,000pcs/day
Destroy – 10,000pcs/day
Bumper 3D- Effect-4,000pcs/day.
WORKER’S WELFARE
ARS supports its employee by setting up welfare facilities like medical Centre, day care centre and canteen. It has properly equipped with Doctors and nurse, its medical unit consultation & medication to Worker’s general health care requirement. It also bears full expense Of treatment of any injuries incurred in working hours.
QUALITY ASSURANCE
Our quality department is equipped with skilled and experienced Personnel to supply all garment that quality check and screened Base on customer’s quality standard and acceptance prior for Final shipment.
DELIVERY
We have immense capacity to give support to our customers for their orders and our in-house garments production. The average combined delivery quantity is approximately 50,000-60,000 pieces per day.
NOMINATED CUSTOMER
Next
INDITEX
Pull & Bear
Zara
Lefties
Bershka
Oysho
HONORABLE CUSTOMER
Okaidi, Obaibi, KappAhl, Debenhams, Timezone, E-Land, Lanny Fashion, VF Asia, Ring of Fire, New Yorker, Terenova, Lee, Academy, Next, pull & Bear, Zara, Bershka, Lefties, MS Mode, J.C Penny, Cache-Cache, Clayton, Hellenic, Pizza-italia, Notting Hill, Cotton, Spring Field etc.
Certification
ISO 9001-2008 : Certified.
Typical operation sequence of our process:
1. Factory Wet process area
2. Primary Filtration
4. Settling & Separation of Sludge
5. Pressure Filtration
3. Cooling & Mixing, Coagulation Dosing
6. Filtrate Water & pH checking
7. Chemical Reserver